SP-11 Rapid Curing Epoxy Patching Paste
SP-11 is a rapid-curing, pre-thickened high-viscosity, nonylphenol-free epoxy resin, paired with a thickened cycloaliphatic amine reactant.
Overview
SP-11 is a rapid-curing, pre-thickened high-viscosity, nonylphenol-free epoxy resin, paired with a thickened cycloaliphatic amine reactant. When properly mixed at a 1:1 ratio by volume, this combination creates a non-shrinking, high-viscosity patch with high compressive and tensile strength that can be scraped in as little as 30 minutes and sanded or ground in as little as 2 hours after placement.
Uses and Benefits
SP-11 is most often used to patch concrete holes, cracks, divots and non-moving joints. It can also be used when a feathered edge is required for smooth transitions between differing planes. SP-11 kit will cover approximately 6.4 sq. ft. at 1/4" or 300 LF of 1/4" X 1/4" joint.
Limitations
SP-11 is designed to be applied at temperatures between 60-90°F. Cooler temperatures will increase cure times. Warmer temperatures will decrease working and cure times. Verify that substrate temperature is above 5 degrees of dewpoint during application and cure of material to avoid a potential amine blush.
Preparation
The preparation method for each project is determined by a full understanding of the substrate to be coated, the chemistry of the coating system being used, the coating system thickness, and numerous other factors. The coating installer should fully read and understand ICRI Guideline NO. 310.2R-2013 and OSHA 29 CFR 1926.1153 before starting preparatory work. The aim, of preparing a substrate for coating applications, is to roughen the surface, remove weak layers, contaminants, dirt, debris and present a solid, clean, dry substrate for the primer. If unsure as to the level of preparation needed contact Polymer Nation at Lab@polymerNation.com.
Technical Data
At a glance: the specs most teams decide on.
- Solids by Volume (Mixed)
- 100%The data below was gathered at temperatures of 72-75°F and 30-50% RH
- Through Dry
- 2-3 hoursCooler temperatures will increase cure times. Warmer temperatures will decrease working and cure times. The data below was gathered at temperatures of 72-75°F and 30-50% RH
- Full Cure
- 7 daysCooler temperatures will increase cure times. Warmer temperatures will decrease working and cure times. The data below was gathered at temperatures of 72-75°F and 30-50% RH
- Dry to Touch
- 1-1.5 hoursCooler temperatures will increase cure times. Warmer temperatures will decrease working and cure times. The data below was gathered at temperatures of 72-75°F and 30-50% RH
- Dry to Lightly Use
- 4-5 hoursCooler temperatures will increase cure times. Warmer temperatures will decrease working and cure times. The data below was gathered at temperatures of 72-75°F and 30-50% RH
- Working Time
- 5-8 minutesWarmer temperatures will decrease working and cure times. The data below was gathered at temperatures of 72-75°F and 30-50% RH
- Ideal Application Temperature
- 60-90°FVerify that substrate temperature is above 5 degrees of dewpoint during application and cure of material to avoid a potential amine blush.
- Mix Ratio (Liquids by Volume)
- 1:1It is always recommended to mix the entire kit, whenever possible, to avoid off-ratio mixtures.
- Coverage Per Mix
- SP-11 kit will cover approximately 6.4 sq. ft. at 1/4" or 300 LF of 1/4" X 1/4" joint.
- Number of Components
- 2A mixture consists of .5 gal SP-11 Part A, .5 gal SP-11 Part B.
- Storage Temperature
- 60-80 degrees F
- Number of Mixes per Kit
- 11 mix equals .5 gal of Part A & .5 gals of Part B
Colors & Packaging
Colors
Clear
Packaging
- Available sizes
- 1 Gallon kits
Mixing & Application
Mix equal volumes of SP-11 Part A, and SP-11 Part B in a drywall mud container or mortar board. Using a spatula or spoon, place equal portions of Part A and Part B together, and then mix with a broad knife or margin trowel or similar mixing tool. Making sure to scrape the walls and folding the material thoroughly until consistent in color and viscosity until desired paste consistency is achieved.
Disposal: Dispose of material, containers, solvents, etc., per Federal, State and local guidelines, rules and laws.
More Patching, Joint, Cove
Related products
Complete the system or compare close alternatives in the same family.
Made in the USA · Tech Support Included
Need SP-11 for your project?
Our team will help you spec the right system, quantities, and colors, and get you a quote fast.








